DTS was able to determine that the existing DX plant was not suited for use as a VAV system and that the only suitable way to correct the existing problems of water carry over, lack of cooling in some zones and repeated failure of existing DX systems was to replace the DX systems with a chilled water system. The scope of work completed by DTS was to Consult, Engineer, Design and construct a new chilled water system including new 280kW air cooled scroll Carrier chiller, 2 new ChW AHUs and duty and standby ChW pumps, the introduction of economy cycle and ventilation control and optimum stop start all controlled by a new BMS and MSSB fit out.

The long term benefit to the client included, improved air indoor quality, reduced energy consumption, close and even temperature control.